Skip to content
Home
What is GeoExchange
About Us
Slim Jim® Geo Lake Plate® Overview
Projects
Events
Personnel
Contact Us
Home
King’s Mill Hospital, UK – 1,400 Tons (HR)
King’s Mill Hospital, UK – 1,400 Tons (HR)
1,400 Ton (HR)
SKANSKA: Case Study 40: Kings Mill Hospital, UK
GI Energy: Case Study: King’s Mill Hospital, Mansfield UK
SKANSKA: Report on Geothermal system impact on energy consumption - Kingsmill Hospital
Conceptual Rendering of installation
SJ-10T (304SS) Slim Jim® plates crated for shipment to England
Shipping containers being loaded for the ocean voyage to England
Slim Jim® Assemblies fabricated by installing contractor – Geothermal International
Slim Jim® Assemblies waiting to be moved to installation site
Floatation devices attached to assemblies for ease of movement once placed in the water
Exchangers being placed into the water
Floating to installation site – waiting to be submerged
Exchanger positioned and ready to be submerged
Reed Beds were positioned above the exchangers for wildlife and to mark where the exchangers are installed
Seven – 200 Ton(HR) Slim Jim Assemblies installed for King's Mill Hospital by Geothermal International, Coventry England
Oh, the Power of Water – Picture Perfect!
Return to: Single & Multiple Slim Jim® & Geo Lake Plate® Applications (Over 50T)